2020 PAVEMENT REHABILITATION AND MAINTENANCE PROJECT
The work to be done, in general, consists of roadway repairs, including: cold planning, remove and replace hot mix asphalt (HMA), crack sealing, hot mix asphalt (HMA) overlays, thin maintenance overlays (TMO), reconstructing concrete sidewalk, curb and gutter, constructing concrete pavement and valley gutters, tree removal, tree root pruning, root barrier installation, lowering and adjusting utility covers to finish grade, shoulder backing installation, traffic striping
Addendum 1
(click to expand/collapse)
Name | Size | |||
Addenda 1 | 307.1 KB |
Addendum 2
(click to expand/collapse)
Name | Size | |||
Addendum 2 with FAQs and Detail | 262.2 KB |
Addendum 3
(click to expand/collapse)
Name | Size | |||
Addendum Number 3 with schedule | 157.8 KB |